OVERHAUL
Comprehensive HVAC System Maintenance
OVERHAUL is a powerful and versatile product designed to improve the performance and longevity of your HVAC system. As a combination of Vapco’s System Protect and System Enhance Xpress Inject, it offers a comprehensive solution for various maintenance needs.
Key Features and Benefits:
- Enhanced System Performance: Optimizes overall system efficiency and operation.
- Returns Oil to the Compressor: Helps maintain proper lubrication and performance.
- Reduces Noise: Minimizes noise levels for a quieter operation.
- Prevents and Eliminates Acid: Protects against acid formation and damage.
- Removes Moisture: Helps prevent moisture-related issues.
- Prevents Burnouts: Reduces the risk of compressor burnouts.
OVERHAUL is an essential tool for maintaining the health and efficiency of your HVAC system. Its powerful formula and versatility make it a valuable asset for professionals and homeowners alike.
Part Number; Size
- XPS-5T-OH 1.5 to 5 Ton
- XPS-15T-OH 6 to 15 Ton
- XPS-30T-OH 16-30 Ton
Compatible with all refrigerants, excluding ammonia.
Directions:
Traditional Method:
- Power On: Turn on the AC system and verify it’s running.
- Connect Xpress Inject: Connect the Xpress Inject to the low-side service port.
- Connect Refrigerant Hose: Attach the manifold refrigerant hose to the refrigerant supply tank. Ensure both high and low-side valves are closed.
- Purge Hose: Purge the low-pressure hose before connecting to Xpress Inject.
- Open Valve and Monitor: Open the low-side valve and watch for the tube to clear. Close the valve and turn off refrigerant gas once the tube is clear.
- Disconnect and Recharge: Disconnect the low-side hose from Xpress Inject, install the service port cap, and run the AC unit for at least one hour.
Directions for Direct Inject Hose:
- Power On and Check: Turn on the AC system and verify the compressor is running and the system is fully charged.
- Connect Hose: Connect the “A” side of the hose to the high-pressure service port, ensuring the ball valve is closed.
- Connect Injector Tube: Carefully thread the male end of the injector tube into the “B” side of the hose. Avoid depressing the valve.
- Remove Air: Crack open and close the ball valve to remove air from the hose.
- Connect Injector Tube: Thread the injector tube into the “B” side of the hose.
- Open Valve and Inject: Open the ball valve and let refrigerant flow through. Then, inject the product into the system.
- Close Valve and Disconnect: Close the ball valve and disconnect the hose and injector from the unit.
- Release Charge: Remove the tube from the “B” side of the hose and open the ball valve to release the charge.
Using the Direct Inject Gun:
- Power On: Turn on the AC system and verify it’s running.
- Connect Xpress Inject: Connect the Xpress Inject to the Direct Inject Gun, and then connect the other end to the low-side service port.
- Inject Sealant: Briefly pull the trigger to inject the sealant into the system.
- Disconnect and Run: Disconnect the empty tube from the low-side port and install the service port cap. Run the AC unit for at least one hour.
Note: For optimal results, follow these directions carefully and consult the product label for additional information.
DANGERS & PRECAUTIONS:
Read and understand the product’s label and Safety Data Sheet. May be fatal if swallowed and enters airways. Highly flammable liquid and vapor. May cause skin irritation. Toxic to aquatic life. DO NOT use it in any manner for which it was not designed. Always wear PPE (Personal Protective Equipment) when servicing HVAC equipment. Do NOT handle or use this product until all safety precautions have been read and understood. Keep away from heat/sparks/open flame/hot surfaces – NO SMOKING! Do not breathe dust/fume/gas/mist/vapors/ spray. Wash hands and arms thoroughly after handling. Use only outdoors or in a well-ventilated area. Avoid release to the environment. Wear protective gloves/clothing/face/ eye protection.
Related Products: